Maidens Harbour Feasibility Study

The findings of the Maidens Harbour Feasibility Study that included the preparation of a business plan for 100 berth pontoons, made recommendations on dredging, breakwater and pontoon layout and considered the provision of shore-side facilities within the harbour.

  1. Maidens Harbour Feasibility Study Summary Report
  2. Maidens Harbour Feasibility Summary Report Drawing Extracts
  3. Maidens Harbour Feasibility Study Report
  4. Appendices to Study Report
    1. Appendix A
    2. Appendix B
    3. Appendix C (Figure 2)
    4. Appendix C (Figures 3-13)
    5. Appendix C (Pontoon data sheets)
    6. Appendix D
    7. Appendix E