Construction Consent
Design
All design must be undertaken in accordance with South Ayrshire Council’s
document entitled Roads Development Guide.
Submission of Plans and Associated Documents
Applications for Construction Consent should be accompanied by two paper copies
of detailed working drawings folded to A4 size which should include the following:
- A location plan, showing proposed development on the Ordnance Survey base, to a
scale of 1:1250 or 1:2500, showing the proposed road network and its relationship
to existing development.
- A layout plan of the carriageways, footways, cycleways, verges, footpaths, cycle
paths, retaining walls, bridges, drainage systems and earthworks to a scale of 1:500
(1:200 where pedestrian/vehicle/cycle shared surfaces are proposed) showing:
- the proposed centre, building and kerb lines (and also the back of the footway where
this differs from the building line)
- curve radii of the road alignment and junctions
- dimensioned visibility splays at road junctions
- vehicular access points to properties
- pedestrian crossing points at junctions and other locations where dropped kerbs
will be provided
- cycle crossing points with dropped kerbs where shared use facilities are proposed
- the location of all road gullies
- the location of the road drainage system and its discharge points
- the location and type of lighting columns and lanterns, wall-mounted lighting units
(if applicable), control pillars, underground cables and road crossing ducts
- the location of all underground services and ancillary apparatus
- the full extent of all excavated and infill slopes
- the boundaries of any areas which it is intended will subsequently be offered for
adoption or maintenance
- the layout and specification of all road markings, signs, street name plates and
traffic signals
- precise site limits
- ground floor levels
- details of SUDS system
- driveway gradients
- locations of traffic calming measures
- Road Profiles to a scale 1:500 Horizontal 1:100 Vertical
- Surface Water Drainage Profiles to a scale 1:500 Horizontal 1:100 Vertical
- Typical Cross Sections
- Section 79(1) Agreement for any bridges or structures
- A Safety Audit for the design in accordance with HD19/94 and HA42/94
- Consultation Certificates from appropriate bodies
- Factual Ground Investigation Report including an Interpretive Report, Coal Authority
Mining Report & British Geological Society Report.
- Design and Check Certificates
- General Arrangement Drawing of all Structures showing the structural form, clear
span(s) and other leading dimensions, headroom or clearance, materials, finishes
and parapets with elevation, plan and typical cross sections to scales 1:50, 1:20,
1:10 as appropriate.
- Cycling Audit
- Disability Access Audit
It will be acceptable for these documents to be submitted in an approved electronic
format. The Local Roads Authority's Representative should be contacted to confirm
details of acceptable electronic formats.